Read The Times Australia

Daily Bulletin

Stories behind China's latest mega cross-sea link: from blueprint to reality

BEIJING, CHINA - Media OutReach Newswire - 8 July 2024 - The Shenzhen-Zhongshan Link, a mega cross-sea passage in south China that consists of one underwater tunnel, two bridges, and two artificial islands, opened to traffic on Sunday.



A view of the Shenzhen-Zhongshan Link, a mega cross-sea passage in the Great Bay Area, June 27, 2024.
A view of the Shenzhen-Zhongshan Link, a mega cross-sea passage in the Great Bay Area, June 27, 2024.

Seven years on, Chinese designers and constructors have overcome some of the world's most pressing technical challenges, transforming the passage from a blueprint to a reality and setting 10 world records.

On Wednesday, China News Network interviewed some and discovered the stories behind the one of the most challenging cross-sea cluster projects in the world.

No room for error

This 24-kilometer passage, connecting Shenzhen in the east of the Pearl River estuary with Zhongshan in the west, has significantly slashed travel time between the two cities from about two hours to under 30 minutes.

It is equipped with numerous devices to ensure its safe and stable operation.

The construction personnel need to build a suspension bridge with a tower height of 270 meters and a main span of 1,666 meters approximately 15 kilometers off the coast. They also need to achieve millimeter-level precision in docking 23 immersed tubes, each weighing about 80,000 metric tons, on the seabed nearly 40 meters deep in the Lingdingyang sea. Additionally, within less than six months, they must create an island in the sea with an area equivalent to 19 international standard football fields.

Despite enormous challenges during the construction, these projects were all completed within the scheduled time.

Chen Weibin, General Manager of Technology Center and Project Manager of Shenzhen-Zhongshan Link Contract 9 for Precasting of Immersed Tunnel of CCCC Fourth Harbor Engineering Co., Ltd., introduced that "the construction process of the passage that adopted steel-shell immersed tube structures is irreversible and there was no room for error".

Without any lesson to learn from, the project team adopted 3D printing technology to develop a customized intelligent pouring system, saving 2,500 hours of machinery time.

Independently-developed key technologies

In the construction, breakthroughs in domesticating key technologies have also been achieved.

Suo Xuhong, Director of the Measurement Management Center of CCCC - First Harbor Engineering Company's Shenzhen-Zhongshan Link Project Management Department, introduced that over the past seven years, his team has generated over 170 patents, achieving eight major technological innovations and accomplishments, including rapid island formation and underwater push-type final joints.

For example, he elaborated that "facing complex geological and hydrological conditions, we independently developed the 'underwater 3D printer' -- a gravel leveling ship. We have achieved full localization of both hardware and software, with leveling precision and efficiency meeting the requirements for various specifications of immersed tube tunnel bed construction. Additionally, we integrated the BeiDou system into immersed tube construction for the first time in the world, and developed an integral prefabricated underwater push-type final joint."

Marine ecological environment outweighs cost

The construction of the Shenzhen-Zhongshan Link also attaches great importance to protecting the marine ecological environment. Ma Dingqiang, deputy general manager of the Dredging Branch Company under CCCC-Guangzhou DREDGING CO., LTD,and project manager of the dredging works for the Shenzhen-Zhongshan Link Project (section 09), said that during the trench excavation process, a large amount of decomposed rocks were found to have distributed on the seabed.

Ma explained that according to traditional dredging methods, the most efficient, economical, and conventional approach would be blasting. However, the construction site is located in the Pearl River Estuary, which is on the migration route and an important habitat for the Chinese white dolphin.

After evaluation, a precise mechanical rock-breaking technique for deep water and deep trenches was developed. "This advancement came at a financial cost of about 30 million yuan ($4.13 million) and a time investment of more than one year. However, the impact on the habitat of the Chinese white dolphin was minimized," Ma stated.

About 24 hours after the link opened to traffic, the volume on the mega cross-sea passage had reached 125,000 vehicles, according to the Guangdong Transportation Group.

The issuer is solely responsible for the content of this announcement.

Business News

How Industrial Drying Equipment Supports Efficient Processing

Many industrial processes require moisture to be removed from compressed air, products or process materials before they move to the next stage. Excess moisture can affect equipment performance, produc...

Daily Bulletin - avatar Daily Bulletin

Practical Ways a Whiteboard Can Improve Workplace Communication

Effective communication helps teams stay organised, share ideas and keep track of important information. While digital tools are now common in many workplaces, a whiteboard continues to provide a simp...

Daily Bulletin - avatar Daily Bulletin

Designing Eco-Friendly Custom Water Bottles for Your Next Event

The Evolution of Sustainable Event Merchandise Event planning has undergone a massive transformation over the last decade. Gone are the days when organizers could hand out cheap, single use plastic...

Daily Bulletin - avatar Daily Bulletin

Why Choosing a Professional Florist Melbourne Makes Flower Delivery Impactful

Flowers have a great power to speak when humans cannot express their feelings with right words. Flowers are the best gifts when you are celebrating a birthday or welcoming a newborn child into your fa...

Daily Bulletin - avatar Daily Bulletin

The Business Case for Choosing Australian Fabricators Over Imported Alternatives

For a long time, you might have defaulted to overseas suppliers when sourcing fabricated metal components for a project. The unit price was lower on paper, and the maths seemed straightforward. That...

Daily Bulletin - avatar Daily Bulletin

Australian organisations are relying on business continuity plans built for a far more predictable world

Tariff escalations, supply chain fragility, geopolitical events, and the ongoing threat of cyber disruption have reshaped the risk environment facing Australian organisations. The problem is that ma...

Daily Bulletin - avatar Daily Bulletin

How to Rent a Car for Uber in Melbourne: What Every New Driver Needs to Know

Starting out as an Uber driver in Melbourne is not as complicated as it sounds but getting the vehicle right is where most new drivers get stuck. Uber has strict requirements around vehicle age, condi...

Daily Bulletin - avatar Daily Bulletin

When Should You Speak to a Lawyer About a Legal Issue?

Legal issues can begin with a simple question, then become harder to manage once formal steps are involved. Many people wait until a matter feels urgent before seeking guidance, even though earlier ...

Daily Bulletin - avatar Daily Bulletin

The strategic rise of Bali as Australia’s next essential healthcare support hub

As Australian healthcare providers grapple with unprecedented operational bottlenecks, a new nearshore model is quietly transforming patient care delivery. Forward-thinking organisations,  including...

Daily Bulletin - avatar Daily Bulletin

The Daily Magazine

Top Garment Steamers for Busy Professionals in Australia

The gap between garment steamers built for a quick touch-up and ones built to keep pace with a wor...

Correct Sleeping Posture to Minimize Back Strain

Most people don’t pay much attention to how they sleep until they start waking up with a stiff bac...

Why Product Longevity Matters for Sustainable Australian Buildings

Sustainability in building design is often associated with recycled materials, renewable resources a...

NDIS Support Coordination Explained: What Does a Support Coordinator Actually Do?

NDIS support coordination explained means understanding how a professional can help participants n...

When Should You Speak with Divorce Lawyers in Sydney?

Divorce involves more than completing an online application. It can affect parenting arrangements, p...

How to Choose a Reliable Hot Water System Installer on the Gold Coast

Choosing a reliable installer is just as important as choosing the right hot water system. A qualifi...

How Microtask Platforms Support Modern Digital Promotion

Digital promotion has become increasingly complex. Businesses communicate with customers through w...

Cosmetic Dentistry Options From a Brisbane-Based Dental Team

You cover your mouth when you laugh. You skip the group photo. Maybe you edit pictures to soften a...

Essential Steps to Handle Sudden Tooth Pain and Dental Crises

A sudden, throbbing toothache can totally stop your whole day, with no warning. When severe pain, ...