Read The Times Australia

Daily Bulletin

The 'sky rail' saga: can big new transport projects ever run smoothly?

  • Written by: The Conversation Contributor

Tensions are rising in Melbourne over plans to use elevated rail to remove suburban level crossings. Sydney has already begun building its “Skytrain” project in the city’s northwest. However, the Victorian government is discovering, as have many before it, the travails of translating popular transport promises into big project announcements.

Last month, as residents in ALP electorates along the Dandenong line in Melbourne’s southeast returned from summer holidays, they read tabloid stories of “secret” plans to build a “sky rail” to eliminate nine level crossings. Some logged on to viral online petitions condemning the idea.

Labor won the November 2014 Victorian state election with a plan to remove 50 level crossings over eight years to reduce congestion and improve safety. This was a rapid acceleration of an existing program, which had sunk railways at ten suburban crossings since the 1990s. People knew changes were on the way, but many expected the railway to be put in a trench.

What are the benefits of elevated rail?

Even as researchers long interested in these issues, it took us time to recognise the benefits of elevated rail compared to trenching. In 2012, we began investigating improved station designs for Melbourne. Could stations again become vital nodes in networks of civic public space, rather than neglected back doors to the suburbs they serve?

image With the NSW government eventually convinced of its benefits, the building of Sydney’s Skytrain has begun. AAP/NSW Premier's Office

We set our graduate students the task of re-imagining stations selected by our local government partners. We used these designs to stimulate critical debate across private sector and government professional networks involved in many of Melbourne’s recent station upgrades and crossing removals.

We discovered that some form of grade separation was necessary to achieve a step-change in station performance. After three iterations of our design-research process, it became clear elevated rail had a distinct edge over trenching.

We have continued, with support from the Level Crossings Removal Authority, to investigate design parameters for level-crossing removal in Melbourne while documenting their historical legacies across the city.

Clearly, elevated rail can be done badly, but if done well there are many benefits. These include:

  • opportunities for multi-scale economic and social development around stations;

  • extended networks of linear parks and quiet streets for safer walking and cycling;

  • opportunities to reorganise Melbourne’s bus system and its rail connections;

  • superior passenger experience, views and way-finding;

  • greater efficiency: gravity aids braking and acceleration through stations; and

  • less disruption to traffic and trains during construction.

What about the objections?

Objections to elevated rail have centred on questions of overlooking, noise and shading. Such objections are frequently accompanied by calls for decked-over trenches or full-scale tunnels.

Visual screening from elevated rail is usually not necessary where viaduct height and train speed obviate overlooking. It can easily be achieved where necessary.

Reducing rail noise involves a combination of high-quality design and construction, good maintenance and, in places, low-height sound baffles. Freight, above or below ground, can pose special issues; in New South Wales, a compensation scheme supports sound insulation in homes.

Residents on the Dandenong line may need performance guarantees through post-construction monitoring. However, many living close to level crossings already anticipate an end to disturbances from train whistles, boom-gate bells and tyres bumping over rails.

Shading is more difficult. Negotiated settlements might be needed with some residents.

Decking is impossible on the inclines towards road crossings, since trains need clearance. It is very expensive and only for developers wanting to erect tower blocks above stations would it be attractive.

Deep tunnelling is typically about five times more expensive than trenching. That rules it out except in areas of very high land value, such as the CBD.

The shift from trenches to sky rail

Melbourne has a legacy of successful elevated rail, much of it in desirable suburbs. Yet somehow trenching became the default.

Between 2013 and 2015, our findings on the benefits of elevated rail were presented widely to transport industry experts, government officials and our academic peers. With growing acceptance of our conclusions in these professional networks, it was no surprise that tenders for level-crossing removals on the Dandenong line included options for elevated rail.

The state government was under pressure to act fast on the Dandenong line. Labor came to power just as the previous government was finalising agreements on an “unsolicited” proposal from a private consortium, led by rail operator MTM, to upgrade tracks and remove several level crossings.

The proposed works included plans for what the consortium called “level crossing-lite”. This offered no improvement to the urban realm. It also required the state to pay an “access fee” to MTM to use the upgraded track.

The incoming Andrews government, to its credit, rejected this deal. But that left little time to bring forward new plans to fill the gap and keep Labor’s ambitious electoral promise on track.

Finding new ways to talk about big plans

image Residents' protests have quickly snowballed in Melbourne, which suggests a failure of consultation. AAP/Luke Costin

What options did the government have to bring people with them and not act so far ahead of public expectations?

In Melbourne, as in other Australian cities, consultation on everything from major projects to local development has been utterly debased. Few citizens have any confidence their objections will be heard or their fears addressed.

People with legitimate grievances often feel they have no option but to appeal to the tabloids. Political opportunists do all they can to fan the flames. In such a climate, broaching new or challenging ideas is fraught, yet there are clear imperatives for innovation.

Repairing this damage to civil society will require strong political commitment to more inclusive and open-ended processes of consultation and planning, along with evidence-based policy. Countless international and local models are available.

These new processes will need to weather the anger and distrust created by years of cynical manipulation. The government could start to take the heat out of the debate by providing some accurate comparisons of the costs and benefits of different options for removing level crossings for Dandenong and other rail lines on their list.

The alternative is to abandon the many potential beneficiaries of well-designed elevated rail – who are just coming to appreciate what this might offer – to the uncertain outcomes of a contest between a defensive government and the shrill voices of complaint.

Authors: The Conversation Contributor

Read more http://theconversation.com/the-sky-rail-saga-can-big-new-transport-projects-ever-run-smoothly-54383

Business News

Designing Eco-Friendly Custom Water Bottles for Your Next Event

The Evolution of Sustainable Event Merchandise Event planning has undergone a massive transformation over the last decade. Gone are the days when organizers could hand out cheap, single use plastic...

Daily Bulletin - avatar Daily Bulletin

Why Choosing a Professional Florist Melbourne Makes Flower Delivery Impactful

Flowers have a great power to speak when humans cannot express their feelings with right words. Flowers are the best gifts when you are celebrating a birthday or welcoming a newborn child into your fa...

Daily Bulletin - avatar Daily Bulletin

The Business Case for Choosing Australian Fabricators Over Imported Alternatives

For a long time, you might have defaulted to overseas suppliers when sourcing fabricated metal components for a project. The unit price was lower on paper, and the maths seemed straightforward. That...

Daily Bulletin - avatar Daily Bulletin

Australian organisations are relying on business continuity plans built for a far more predictable world

Tariff escalations, supply chain fragility, geopolitical events, and the ongoing threat of cyber disruption have reshaped the risk environment facing Australian organisations. The problem is that ma...

Daily Bulletin - avatar Daily Bulletin

How to Rent a Car for Uber in Melbourne: What Every New Driver Needs to Know

Starting out as an Uber driver in Melbourne is not as complicated as it sounds but getting the vehicle right is where most new drivers get stuck. Uber has strict requirements around vehicle age, condi...

Daily Bulletin - avatar Daily Bulletin

When Should You Speak to a Lawyer About a Legal Issue?

Legal issues can begin with a simple question, then become harder to manage once formal steps are involved. Many people wait until a matter feels urgent before seeking guidance, even though earlier ...

Daily Bulletin - avatar Daily Bulletin

The strategic rise of Bali as Australia’s next essential healthcare support hub

As Australian healthcare providers grapple with unprecedented operational bottlenecks, a new nearshore model is quietly transforming patient care delivery. Forward-thinking organisations,  including...

Daily Bulletin - avatar Daily Bulletin

Cost Savings and Benefits of Using Used Pallets in Logistics

In today’s competitive logistics and supply chain industry, businesses are constantly looking for ways to reduce operational costs without compromising efficiency and reliability. One of the most prac...

Daily Bulletin - avatar Daily Bulletin

How Fulfilment Services in Australia Help Businesses Scale Efficiently

The growth of e-commerce and modern retail has transformed customer expectations. Consumers now expect fast shipping, accurate order processing, and seamless delivery experiences regardless of where...

Daily Bulletin - avatar Daily Bulletin

The Daily Magazine

NDIS Support Coordination Explained: What Does a Support Coordinator Actually Do?

NDIS support coordination explained means understanding how a professional can help participants n...

When Should You Speak with Divorce Lawyers in Sydney?

Divorce involves more than completing an online application. It can affect parenting arrangements, p...

How to Choose a Reliable Hot Water System Installer on the Gold Coast

Choosing a reliable installer is just as important as choosing the right hot water system. A qualifi...

How Microtask Platforms Support Modern Digital Promotion

Digital promotion has become increasingly complex. Businesses communicate with customers through w...

Cosmetic Dentistry Options From a Brisbane-Based Dental Team

You cover your mouth when you laugh. You skip the group photo. Maybe you edit pictures to soften a...

Essential Steps to Handle Sudden Tooth Pain and Dental Crises

A sudden, throbbing toothache can totally stop your whole day, with no warning. When severe pain, ...

Different Types of Power Poles Used in Australia

Power poles are easy to overlook until one needs replacing, starts leaning, or sits directly in the ...

From Application To Court: How Family Violence Orders Work In Victoria

Most people don't learn how the intervention order process works until they're already inside it. So...

Why Businesses Are Choosing Virtual Reception Services

In today’s fast-paced digital world, businesses are constantly evolving to meet the needs of their...