Read The Times Australia

Daily Bulletin

Atlas Critical Minerals Defines South America's Largest, Highest-Grade Reported Graphite Resource: 24.2 Million Tonnes, Including 17.2 Million Tonnes Indicated at 5.73% Graphitic Carbon

  • Written by: Daily Bulletin

Indicated Grade Approximately 25% Higher Than the Measured and Indicated Grade of the Largest Known Graphite Deposit in the United States

Belo Horizonte, Brazil--(Newsfile Corp. - September 29, 2026) - Atlas Critical Minerals

Corporation (NASDAQ: ATCX) ("Atlas Critical Minerals" or the "Company"), a diversified critical minerals exploration company, today announced the maiden Mineral Resource Estimate ("MRE") for its 100%-owned Malacacheta Graphite Project (the "Project") in Minas Gerais state, Brazil. The MRE is contained in the Technical Report Summary ("TRS") filed as Exhibit 96.1 to the Company's Report on Form 6-K filed with the Securities and Exchange Commission ("SEC") today.

The TRS, including the MRE, was prepared independently by SGS Canada Inc. ("SGS"), a well-respected mineral evaluation company with a global footprint, in accordance with Subpart 1300 of Regulation S-K ("S-K 1300"). The MRE covers only one of the Project's three contiguous mineral tenements and is reported at a 2.0% graphitic carbon ("Cg") cut-off grade:

  • Indicated: 17.2 million tonnes ("Mt") grading 5.73% Cg, containing approximately 986,000 tonnes of graphite.

  • Inferred: 7.0 Mt grading 5.40% Cg, containing approximately 378,000 tonnes of graphite.

Based on a review by the Company of publicly available technical disclosures for graphite projects in South America, Atlas Critical Minerals believes that the Project is the largest graphite resource in South America reported under a globally recognized mineral reporting code (S-K 1300, NI 43-101 or JORC), as measured by contained graphite, and that it has the highest Cg grade among such resources. The Project's Indicated grade of 5.73% Cg is also approximately 25% higher than the 4.6% Cg Measured and Indicated grade reported for Graphite Creek in Alaska - described by the U.S. Geological Survey as the largest known flake graphite deposit in the United States - at the same 2.0% Cg cut-off grade. The Project's Indicated grade is also nearly double the 2.91% Cg Inferred grade at the Kilbourne Graphite Project in New York, which is reported under NI 43-101 at a lower 1.5% Cg cut-off.

Key Highlights

  • Maiden Resource of Scale and Grade:

    • 17.2 Mt Indicated at 5.73% Cg and 7.0 Mt Inferred at 5.40% Cg, for approximately 1.36 million tonnes of contained in-situ graphite across both categories from only one of three contiguous mineral rights.

    • The large initial Indicated resource for the Project provides a robust foundation for the planned Preliminary Economic Assessment.

  • 100% Drill Success with Wide, Consistent Intercepts:

    • All 21 diamond core holes (2,393.90 meters) returned significant graphite intercepts.

    • Highlights include 43.10 meters at 6.20% Cg, 17.30 meters at 10.62% Cg, and 14.20 meters at 9.30% Cg starting from surface.

  • Near-Surface Mineralization Amenable to Open-Pit Mining:

    • SGS considers the deposit amenable to open-pit extraction.

    • More than half of the drill holes (11 of 21) intersected significant graphite within the first ~10 meters down-hole, including 26.20 meters at 7.51% Cg from 8.50 meters and 24.25 meters at 6.61% Cg from 8.80 meters.

  • Only ~2.5 km of an ~11-km Graphite Corridor Drilled:

    • The resource was defined along approximately 2.5 kilometers of strike.

    • Approximately 8.5 kilometers of potential mineralization remains along the trend, including on the Project's two other tenements.

    • SGS reports that the deposit remains open along strike and at depth.

  • Premium Product Credentials:

    • Concentrate obtained from Project samples along the ~11-km graphite corridor was previously sent to a well-respected laboratory in the United States that specializes in graphite for product specification studies.

    • As disclosed in a prior technical report summary filed with the SEC on November 12, 2025, the laboratory was able to qualify the concentrate for use not only in electric vehicle batteries but also in nuclear reactors, a qualification that requires meeting the industry's most stringent purity standard.

Maiden Mineral Resource Estimate

Cut-Off Grade (% Cg)CategoryTonnage (Mt)Average Grade (% Cg)Contained Cg (tonnes)*
2.0Indicated17.25.73~986,000
2.0Inferred7.05.40~378,000

 

Table 1 - Combined Malacacheta Mineral Resource Estimate at 2.0% Cg cut-off (effective September 14, 2026). Source: TRS, Table 11-8.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6728/316290_30d104e6b43f7a91_002.jpg

Figure 1 - SGS Combined Malacacheta Mineral Resource Estimate at 2.0% Cg cut-off, with the constrained open-pit block model showing graphitic carbon grades at the Project's first tenement.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6728/316290_30d104e6b43f7a91_002full.jpg

*Contained graphitic carbon is calculated by the Company as tonnage multiplied by grade. It is in-situ, rounded, and does not account for mining dilution, mining losses or processing recoveries.

Drilling Confirms Continuity, Width and Grade

The MRE is supported by a diamond drilling program of 21 HQ core holes totaling approximately 2,394 meters, completed in 2026.

  • The program was designed from geological mapping and an induced polarization (IP) survey.

  • Every drillhole returned significant graphite intercepts.

  • The results show consistent mineralized widths and grades, supporting the geological interpretation and the Company's understanding of the deposit.

  • Graphite mineralization shows continuity over approximately 2.5 kilometers along strike, and the system remains open for further expansion.

Hole IDDepth From (m)Depth To (m)Length (m)Assay (% Cg)
MPDDH-001243.0086.1043.106.20
MPDDH-000826.2466.0039.765.62
MPDDH-000923.2257.0033.787.97
MPDDH-00188.5034.7026.207.51
MPDDH-00108.8033.0524.256.61

 

Table 2 - Longest graphite intercepts.

Hole IDDepth From (m)Depth To (m)Length (m)Assay (% Cg)
MPDDH-001744.7062.0017.3010.62
MPDDH-00110.0014.2014.209.30
MPDDH-001571.5581.309.758.83
MPDDH-000755.7578.4122.668.27
MPDDH-0014117.33138.0020.678.26

 

Table 3 - Selected high-grade graphite intercepts.

Source: TRS, Table 7-3. Intervals are down-hole lengths. All holes were drilled at a -60° dip toward azimuth 180°.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6728/316290_30d104e6b43f7a91_003.jpg

Figure 2 - Drill core from hole MPDDH-0017 showing a high-grade graphite schist interval. MPDDH-0017 returned 17.30 meters at 10.62% Cg, the highest-grade significant intercept of the program.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6728/316290_30d104e6b43f7a91_003full.jpg

Substantial Room to Grow

  • The MRE covers only one tenement (approximately 997 hectares) of three contiguous tenements totaling ~2,822 hectares.

  • The reported drilling covers only approximately 2.5 km of strike - less than one-quarter of the Project's ~11 km graphite corridor - leaving ~8.5 km untested along the same mineralized trend.

  • SGS has recommended continued drilling to extend the limits of the deposit and to upgrade its resource classification.

"This maiden resource is a defining milestone for Atlas Critical Minerals and, we believe, for graphite supply in the Americas," said Marc Fogassa, Chairman and Chief Executive Officer of Atlas Critical Minerals.

"Our maiden graphite report already points to a quality asset: our Indicated grade exceeds that of the largest known graphite deposit in the United States by approximately 25%. Beyond an already sizable initial resource, , we have drilled only about 2.5 kilometers of an 11-kilometer corridor, on just one of our three contiguous tenements. Importantly, samples from our Project have been processed, tested, and qualified by a well-regarded graphite laboratory in the U.S. for use in electric vehicle batteries and in nuclear reactors, two of the highest-value markets."

Next Steps

The Company will now focus on advancing the Project through additional exploration, metallurgical testwork and technical studies. It will continue to evaluate opportunities to expand and improve the Mineral Resource at the first tenement and across the Project's two other contiguous tenements. Planned work includes:

  • Resource Expansion Drilling:

    • Drill-test the remaining ~8.5 kilometers of the graphite corridor, including on the Project's two other tenements.

    • Step-out and depth drilling at the first tenement, where the deposit remains open.

  • Resource Upgrading: Infill drilling to convert Inferred Mineral Resources to the Indicated category, as recommended by SGS.

  • Metallurgical Testwork: Flotation optimization, flake-size distribution and variability testing on the graphitic schist, as recommended by SGS.

  • Economic Evaluation: Advance engineering and economic studies, including a Preliminary Economic Assessment ("PEA") targeted for Q2 2027.

Graphite: A Critical Mineral

Graphite is the dominant anode material in lithium-ion batteries, which are essential for electric vehicles and energy storage systems. High-purity graphite is also used in nuclear reactors and advanced industrial applications. Several governments, including the U.S., recognize graphite as a critical mineral. According to the U.S. Geological Survey, the United States had no domestic natural graphite production in 2025 and remained 100% reliant on imports.

  • According to MarketsandMarkets, a commodity research firm, the global graphite market is projected to reach USD 36.4 billion by 2030, growing at a 15.1% CAGR.

  • Benchmark Mineral Intelligence, a battery supply chain research firm, estimates that 97 new graphite mines will be needed by 2035 to meet global demand.

Atlas believes the Project's combination of scale, grade, near-surface mineralization and demonstrated purification performance positions it well to help address the growing supply gap. Furthermore, Brazil is a safer and more established mineral jurisdiction than many other countries where graphite is found. Additionally, the Project's location in Brazil allows for lower-cost, year-round mining potential, a significant advantage over deposits located in harsher climates.

Qualified Person and Technical Report Summary

The Company's exploration activities at the Project are conducted in accordance with S-K 1300, the U.S. standard for mineral property disclosure.

  • The MRE was prepared by Marc-Antoine Laporte, P.Geo., M.Sc., of SGS Geological Services. Mr. Laporte is a recognized critical minerals geologist and an independent Qualified Person for graphite under S-K 1300.

  • The TRS has an effective date of September 14, 2026 and a report date of September 23, 2026. The MRE is part of the TRS.

  • The TRS was filed as Exhibit 96.1 to the Report on Form 6-K filed by the Company with the SEC on September 29, 2026.

About Atlas Critical Minerals Corporation

Atlas Critical Minerals Corporation (NASDAQ: ATCX) is an exploration and development company focused on critical minerals, including rare earths, graphite, and uranium. The Company's focus is to build a diversified global supply chain for the strategic minerals essential for the artificial intelligence revolution, energy transformation, and defense uses. More information is available at www.atlascriticalminerals.com and in the Company's filings with the U.S. Securities and Exchange Commission.

Safe Harbor Statement

This press release contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements are based upon the current plans, estimates and projections of Atlas Critical Minerals and its subsidiaries and are subject to inherent risks and uncertainties which could cause actual results to differ from the forward-looking statements. Therefore, you should not place undue reliance on these forward-looking statements.

Risks related to the Company and its subsidiaries are discussed in the section entitled "Risk Factors" in the Company's Form 20-F filed with the Securities and Exchange Commission (the "SEC") on February 20, 2026. Please also refer to the Company's other filings with the SEC, all of which are available at www.sec.gov. In addition, any forward-looking statements represent the Company's views only as of today and should not be relied upon as representing its views as of any subsequent date. The Company explicitly disclaims any obligation to update or revise any forward-looking statements to reflect any change in its expectations or any change in events, conditions, or circumstances on which any such statement is based.

Investor Relations

Brian W. Bernier
Vice President, Investor Relations
+1 (833) 661-7900
brian.bernier@atlas-cm.com 
https://www.atlascriticalminerals.com/ 
@Atlas_Crit_Min

Corporate Logo

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/316290

Business News

The Rise of Digital Marketplaces in the Australian Trade Sector

For decades, the Australian trade and construction sector operated almost entirely on word-of-mouth recommendations and local community networks. Small business owners typically relied on local newspa...

Daily Bulletin - avatar Daily Bulletin

How Immigration Lawyers Can Help

Introduction Visa decisions can shape employment, family life, study plans, travel, and future residence. A small omission can lead to delay, added expense, or refusal. Immigration lawyers assess l...

Daily Bulletin - avatar Daily Bulletin

How Industrial Drying Equipment Supports Efficient Processing

Many industrial processes require moisture to be removed from compressed air, products or process materials before they move to the next stage. Excess moisture can affect equipment performance, produc...

Daily Bulletin - avatar Daily Bulletin

Practical Ways a Whiteboard Can Improve Workplace Communication

Effective communication helps teams stay organised, share ideas and keep track of important information. While digital tools are now common in many workplaces, a whiteboard continues to provide a simp...

Daily Bulletin - avatar Daily Bulletin

Designing Eco-Friendly Custom Water Bottles for Your Next Event

The Evolution of Sustainable Event Merchandise Event planning has undergone a massive transformation over the last decade. Gone are the days when organizers could hand out cheap, single use plastic...

Daily Bulletin - avatar Daily Bulletin

Why Choosing a Professional Florist Melbourne Makes Flower Delivery Impactful

Flowers have a great power to speak when humans cannot express their feelings with right words. Flowers are the best gifts when you are celebrating a birthday or welcoming a newborn child into your fa...

Daily Bulletin - avatar Daily Bulletin

The Business Case for Choosing Australian Fabricators Over Imported Alternatives

For a long time, you might have defaulted to overseas suppliers when sourcing fabricated metal components for a project. The unit price was lower on paper, and the maths seemed straightforward. That...

Daily Bulletin - avatar Daily Bulletin

Australian organisations are relying on business continuity plans built for a far more predictable world

Tariff escalations, supply chain fragility, geopolitical events, and the ongoing threat of cyber disruption have reshaped the risk environment facing Australian organisations. The problem is that ma...

Daily Bulletin - avatar Daily Bulletin

How to Rent a Car for Uber in Melbourne: What Every New Driver Needs to Know

Starting out as an Uber driver in Melbourne is not as complicated as it sounds but getting the vehicle right is where most new drivers get stuck. Uber has strict requirements around vehicle age, condi...

Daily Bulletin - avatar Daily Bulletin

The Daily Magazine

Buying Property with Someone else? Settle these Questions First

Buying a home with a partner, a sibling or a friend can make a purchase possible that neither of you...

How to Handle a Blocked Drain in Bribie Island Before Starting Deck Repairs

Planning an outdoor upgrade brings excitement, but building a beautiful timber deck requires caref...

What to Look For When Selecting an Installation Specialist for Gas Stoves and Water Filters in Brisbane

Upgrading your kitchen or improving your home's water quality requires specialised skills. When mana...

What to Consider Before Cleaning Your Exterior: Deck Pressure Cleaning, Pressure Cleaning, and How Much Does It Cost to Pressure Wash a House?

Maintaining a home's exterior in coastal Sydney requires regular attention to combat salt spray, mou...

Signs Your Trailer Needs Professional Repair Before Its Next Long Haul

A long road trip can put considerable strain on a trailer, particularly when it is carrying heavy ...

Automatic, Manual, CVT or DCT: Which Transmission Suits Australian Drivers?

Australia’s enthusiasm for cars is nothing new. From family SUVs and work utes to compact city cars ...

Cape Town: Full Day Private Cape Peninsula & Cape Point Tour

Embark on an unforgettable adventure with a full day private Cape Peninsula & Cape Point tour...

SMSF Audit Services in Brisbane: What Trustees Should Know Before Hiring One

Every self-managed super fund (SMSF) needs an independent audit each year before its annual return...

Why Local Legal Knowledge Matters When Choosing Lawyers in Brisbane

Legal matters often involve more than understanding legislation. They require knowledge of local pro...